Price sitework from existing ground through final improvements
Sitework takeoffs for earthwork, grading, paving, drainage, utilities, erosion control, and exterior improvements—organized for bid review.
Turn civil drawings into organized bid quantities
Sitework estimates require coordination across horizontal limits, vertical elevations, material sections, haul assumptions, trench conditions, and phased work.
Earthwork quantities
Quantify excavation, fill, stripping, topsoil, subgrade treatment, and cut-and-fill based on available surface data.
Utility takeoffs
Measure pipe, structures, fittings, trenching, bedding, backfill, testing, and restoration by system and size.
Surface improvements
Organize asphalt, concrete paving, aggregate base, curbs, sidewalks, striping, fencing, and landscape-related quantities.
Coverage for civil, earthwork, utility, and exterior scopes
We adapt the estimate to the available CAD, PDF, survey, geotechnical, landscape, and civil documents.
Clearing, demolition, stripping, and erosion control
Mass excavation, grading, import, and export
Aggregate base, asphalt, concrete paving, and curbs
Storm drainage, sanitary sewer, and domestic water
Site concrete, striping, fencing, and signage
Landscaping, irrigation, and exterior restoration
A disciplined sitework estimating workflow
01 · Share the bid documents
Send the plans, specifications, addenda, project location, bid date, and the exact scope you want covered.
02 · Confirm coverage
We review the documents, identify questions, and confirm the fee, turnaround, deliverables, and exclusions before starting.
03 · Measure and price
An estimator performs the takeoff, organizes quantities, applies labor and material pricing, and checks the scope.
04 · Deliver and support
Receive editable files and supporting markups, with revisions available when bid documents or scope change.
sitework estimating questions
What documents should I send?
Plans and specifications are the best starting point. Addenda, bid forms, scope letters, equipment schedules, alternates, and vendor requirements should also be included when available.
Can you provide quantities without pricing?
Yes. We can prepare a quantity takeoff only or a detailed estimate with labor, material, equipment, and other agreed cost components.
Can the estimate be revised before bid day?
Yes. When drawings, addenda, or clarifications change, share the updates and we can revise the affected scope based on the agreed service.
Explore the next step for your project
Send the civil set for a sitework scope review
Send the plans, specifications, addenda, project location, and bid date. We will review the documents and confirm a clear fee, turnaround, and deliverable.
REAL SITEWORK DELIVERABLE
Review a Real Sitework Estimate Workbook
Review an Excel estimate that organizes clearing, excavation, grading, aggregate, paving, erosion control, utilities, equipment, trucking, labor, and material quantities for sitework bidding.
