Coordinate mechanical, electrical, and plumbing costs across one bid
Integrated MEP takeoffs and estimates for equipment, distribution, controls, fixtures, devices, piping, ductwork, raceways, labor, material, and subcontract scope.
Create a complete MEP cost picture for bid review
An integrated estimate helps general contractors, developers, and design teams compare trade coverage, allowances, alternates, and system costs on a consistent basis.
Discipline separation
Organize mechanical, electrical, plumbing, fire protection, controls, and specialty systems into reviewable divisions.
Cross-trade coordination
Identify equipment connections, controls interfaces, sleeves, supports, access, and documented scope boundaries.
Cost-ready summaries
Provide trade totals, system breakdowns, equipment schedules, assumptions, exclusions, and editable files.
MEP coverage from equipment through distribution
Coverage is tailored to the available design documents, procurement approach, contractor scope, and level of estimate required.
HVAC equipment, ductwork, piping, insulation, and controls
Electrical service, distribution, lighting, power, and low voltage
Plumbing fixtures, domestic water, sanitary, storm, and gas
Fire protection and specialty systems when included
Equipment connections and documented trade interfaces
Alternates, allowances, and trade-level summaries
A disciplined MEP estimating workflow
01 · Share the bid documents
Send the plans, specifications, addenda, project location, bid date, and the exact scope you want covered.
02 · Confirm coverage
We review the documents, identify questions, and confirm the fee, turnaround, deliverables, and exclusions before starting.
03 · Measure and price
An estimator performs the takeoff, organizes quantities, applies labor and material pricing, and checks the scope.
04 · Deliver and support
Receive editable files and supporting markups, with revisions available when bid documents or scope change.
MEP estimating questions
What documents should I send?
Plans and specifications are the best starting point. Addenda, bid forms, scope letters, equipment schedules, alternates, and vendor requirements should also be included when available.
Can you provide quantities without pricing?
Yes. We can prepare a quantity takeoff only or a detailed estimate with labor, material, equipment, and other agreed cost components.
Can the estimate be revised before bid day?
Yes. When drawings, addenda, or clarifications change, share the updates and we can revise the affected scope based on the agreed service.
Explore the next step for your project
Send the MEP documents for a coordinated scope review
Send the plans, specifications, addenda, project location, and bid date. We will review the documents and confirm a clear fee, turnaround, and deliverable.
REAL MEP DELIVERABLE
Review a Real MEP Estimate Workbook
See how mechanical, electrical, and plumbing costs can be coordinated in one Excel workbook while keeping each discipline’s quantities, labor, materials, equipment, allowances, and totals clearly separated.
