ROOF TAKEOFF & ESTIMATING SERVICES

Measure complete roofing systems—not just surface area

Roof takeoffs for membranes, shingles, insulation, cover boards, flashings, edge metal, penetrations, drainage, accessories, labor, and waste.

ROOFING ESTIMATING SUPPORT

Build a roofing bid around complete assemblies

Accurate roofing estimates connect measured areas with system build-up, details, flashing lengths, drainage, safety, access, and installation conditions.

System-by-system areas

Separate membrane, shingle, metal, coating, insulation, cover board, vapor retarder, and underlayment quantities.

Perimeter and flashing detail

Measure parapets, curbs, walls, penetrations, valleys, ridges, eaves, gutters, downspouts, and edge metal.

Bid cost structure

Organize material, labor, equipment, waste, warranty-related requirements, and documented allowances.

DETAILED TRADE COVERAGE

Roofing quantities from deck preparation to sheet metal

Coverage is based on the specified assemblies, architectural details, roof plan, elevations, schedules, and requested contractor scope.

Low-slope membrane and steep-slope roofing
Insulation, taper systems, and cover boards
Vapor retarders, underlayments, and deck preparation
Base, curb, wall, and penetration flashings
Copings, edge metal, gutters, and downspouts
Roof accessories, walk pads, drainage, and documented alternates

OUR PROCESS

A disciplined roofing estimating workflow

01 · Share the bid documents

Send the plans, specifications, addenda, project location, bid date, and the exact scope you want covered.

02 · Confirm coverage

We review the documents, identify questions, and confirm the fee, turnaround, deliverables, and exclusions before starting.

03 · Measure and price

An estimator performs the takeoff, organizes quantities, applies labor and material pricing, and checks the scope.

04 · Deliver and support

Receive editable files and supporting markups, with revisions available when bid documents or scope change.

FREQUENTLY ASKED QUESTIONS

roofing estimating questions

What documents should I send?

Plans and specifications are the best starting point. Addenda, bid forms, scope letters, equipment schedules, alternates, and vendor requirements should also be included when available.

Can you provide quantities without pricing?

Yes. We can prepare a quantity takeoff only or a detailed estimate with labor, material, equipment, and other agreed cost components.

Can the estimate be revised before bid day?

Yes. When drawings, addenda, or clarifications change, share the updates and we can revise the affected scope based on the agreed service.

RELATED SERVICES

Explore the next step for your project

READY TO PRICE THE ROOFING SCOPE?

Get a roofing takeoff that follows every system and detail

Send the plans, specifications, addenda, project location, and bid date. We will review the documents and confirm a clear fee, turnaround, and deliverable.

REAL ROOFING DELIVERABLE

Review a Real Roofing Estimate Workbook

Open a roofing estimate workbook showing roof areas, slopes, membranes, shingles, insulation, flashing, accessories, waste, labor, and material pricing organized for contractor bid review.