SCHEDULING

Scheduling

Step 1

 This step involves the process of converting an outline plan into a time-based schedule.

Step 2

 By scheduling properly and making the most accurate predictions, both the contractor and owner are able to manage the project as effectively as possible. It also helps in dividing the workload as accurately as possible.

Step 3

 At Build it Estimating all our construction schedules are made via Primavera P6 software. Furthermore, all schedules are updated monthly so that they show a realistic image and clearly highlight any potential delays, slippage and critical tasks. Our schedule also includes time impact analysis and extension of time claims.

Project Planning Schedules

  • Planning Schedule for Owners, Developers and Design Professionals.
  • Bid Schedule and “What-If” Study.
  • Contract Required CPM Schedule with Cost and Resource Loading.

Progress Schedule Updates & Monitoring

  • Contractor Schedule Update and Progress Report.
  • Comparison of Actual versus Planned Production Graphics.
  • Identification and Documentation of Changes, Delays or Acceleration.

Benefits We Deliver To You

  • Early discovery and mitigation of risks.
  • Properly plan and divide jobs so that there is maximum time utility.
  • Reduce costs that rise due to delays.
  • Proper project execution.

Improving The Accuracy And Predictability Of Schedules

Schedule Risk Analysis (SRA) service ensures that all parties involved with the project are provided with information regarding the progress of the project. It identifies any potential risks and delays. Though this service can be used at point during the project, it is best to be used in the early stages so that any potential risks can be prevented.

Buildit Estimating Specialization

Involves the preparation, reviewing and analysis of the construction schedule throughout the project.

Schedule Risk Analysis

Identifies the risk early on in the project, proposes possible options to avoid the risk and helps counteract potential delays.

Maintaining

The information that is entered into a schedule comes from various sources, so it is very important that all that information is continuously and properly updated throughout the duration of the project.

Buildit Estimating provides cost effective scheduling services at several levels

Schedules prepared by other parties are also reviewed and analyzed for accuracy and precision.